NCCER
CT0911: Installation of Plastic Pipe in a Bore
CT0911: Installation of Plastic Pipe in a Bore
Couldn't load pickup availability
Course describes the prerequisites and knowledge required for a pipeline worker to successfully install plastic pipe in a bore using horizontal directional drilling (HDD). It addresses the conditions and safety concerns of working on an installation site with HDD, pipe handling considerations, safety equipment, installation tools and equipment, inspection and installation procedures, and the abnormal operating conditions (AOCs) that may occur during the installation.
**Important**
All Pipeline courses are for training only.
Testing for Operator Qualifications must be done through an NCCER Accredited Training Sponsor.
Course Enrollment:
Course enrollment occurs automatically upon payment at checkout. Enrollment utilizes the email address provided. To access a course after purchase, log in to (or create) an NCCER Account using the email address provided during checkout, then click "Learning Platform."
